Friday, January 16, 2015

A look at the inside of Jefferson.

9th Street view
               Near main entrance
 Looking towards Title 1 rooms
 Door frames
 Outside brick work
 Classroom duct work
 Typical wall studs
 Fresh air ventilation from 2nd floor to first floor
 Pads for Mechanicals on second floor
 Hometown working on pipes on second floor
 Last concrete pour on second floor being trowelled.
 Bathroom plumbing
 Hall way
 Duct work
 Outside brick work again
 Scaffolding is a lot taller than the picture shows
 First floor hallway
 Office area
 Gym a very large space
 Gym storage area
 Kitchen